Regulatory Disclosures
Home » Regulatory Disclosures » Available Capacity

Available Capacity

In terms of Regulation 4(2) of PNGRB (Access Code for Natural Gas Pipeline) Regulations, 2008, declaration of available capacity of SHPPL as per Schedule I format is given below:

SHPPL: Schedule - I

Details are as of April 01, 2025

Sr. No Name Description
1 Name of Entity Reliance Gas Pipelines Limited
2 Name of Pipeline Shahdol - Phulpur Natural Gas Pipeline
3 Section wise capacity on the pipeline 3.5 MMSCMD (Total Capacity)
a Number of sections 1
b Name of section with start and end point Shahdol - Phulpur
c Capacity -(i) Volume terms (ii) energy terms 3.5 MMSCMD (Total Capacity)
4 Number of AHA's 1
5 Number of entry points on the pipeline route 1
6 Location of entry points Shahdol
7 Number of Exit Points 4
8 Location of Exit Points Phulpur, IPS-Rewa, MLV 01(BGRL), CS01(ATGL)
9 Entry point wise Capacity of Pipeline Refer Annexure 1
10 Exit point wise Capacity of Pipeline
11 Technical parameters
a Inlet pressure at entry point (Barg) Min 20
b Calorific Value band at entry point (Btu/scm - on GCV Basis) >=33684
c Temperature (Degrees Celsius) <=55
d Other elements as per Schedule II
i) Hydrocarbons dew pt (Degree Celsius, max.) 0*
ii) Water dew pt (Degree Celsius, max.) 0*
iii) Hydrogen sulphide (ppm by wt. max.) 5
iv) Total Sulphur (ppm by wt. max.) 10
v) Carbon Dioxide (mole % max.) 6
vi) Total inerts (mole %) 8
vii) Temperature (Degree Celsius, max) 55
viii) Oxygen (% mole vol. max.) 0.2
12 Status of extra capacity available in the pipeline system for common carrier - (mmscmd) 0.875
13 Details of common carrier capacity being used by transporter itself or on contract carrier basis. Nil
14 Any demand pending with the transporter for common carrier usage of the pipeline along with duration of such pendency Nil
15 Preference on entry and exit points Nil
Note :
* At the pipeline operating pressure.